n/n | Titles | Unit of measure
| Tariff (VAT exclusive) | Tariff (VAT inclusive)
| Effective date
|
1
| Yerevan TPP's energy block worked by thermal and gas cogeneration cycle (2010-№196A)
| May 20, 2010
|
| 1.1 | 13 and 25 atmosphere pressure steam thermal energy tariff (P) | AMD/GJ | P=7.644*E+10.153 | P=(7.644*E+10.153)*1,2 |
E – AMD's actual exchange rate for one US $, established by the RoA Central Bank on the 25th of the month previous to each reporting month
|
2
| ArmRuskogeneratsia CJSC, tariffs for thermal energy sold to consumers of Hovhannisyan district of Yerevan's Avan administrative region (2011-№603A)
| January 21, 2012 |
| 2.1 | Within the one-rate tariff system | | | |
| 2.1.1 | Tariff for heating | AMD/kWh | 13.333 | 16.0 |
| 2.1.2 | Tariff for hot water supply | AMD/cum | 779.167 | 935.0 |
| 2.2 | Within the two-rate tariff system | | | |
| 2.2.1 | Tariff for heating | AMD/kWh | 10.667 | 12.8
|
| 2.2.2 | Monthly fee for heating | AMD/m2 | 26.967
| 32.36
|
| 2.2.3 | Tariff for hot water supply | AMD/cum | 623.333
| 748.0 |
| 2.2.4 | Monthly fee for hot water supply | AMD/m2 | 14.725
| 17.67
|